Challenge:
-
- Reduce Energy Cost
- As an example,
- - 2000 Ton IMM
- - Operating 3 shifts, 250 days a year
- - Power usage: 400 KW/h at 0.10 $/KWh
- - Cycle Time = 60 Sec
- - 3 Setups per day @40 minutes each
- - Cost of electricity = $220,000
- As an example,
- Reduce Energy Cost
Solution:
-
- Energy Value Stream Mapping (EVSM)
-
- In the above example,
-
- - if the change over time is reduced to 25 minutes through SMED
- - If the cycle time is reduced to 50 seconds through Standardization and implementing ideas such as:
- Reduce the mold open distance
- Close on the fly
- Reprogram the robot
- Then Cost of electricity = $180,000
-
-